Thursday 26 December 2013

Integrated Project!

The 6th project required us to work in teams of 16 from different courses. I was assigned to Group 10. The group consists of 3 students from Architecture, 3 students from Urban Planning, 3 students from Building Technology, 3 students from Construction Management, 2 students from Quantity Surveying and lastly 1 student from Interior Design and Building Surveying respectively.

We were asked to design an amphitheater stage for the usage of students in HBP. We were not only asked to design the stage, but were also required to build a model of the actual stage using a scale of 1:10, to come up with the costings related with the model and to state the suitable materials to be used for the actual stage and also the model of the stage.

We've decided that our concept should be something that can be related with the proposed site. As the site is overlooking the sea, we had agreed upon using the wave element as our concept for the stage design. Thus, the chosen name for our stage is Morwenna which actually meant the ocean waves in Welsh.

In the midst of measuring the woods.





The dimensions for the actual amphitheater stage.

Presentation board.

Presentation board.

Presentation board.



Evolution of our stage design.

A prototype of our stage for better understanding of the design.

In the midst of cutting the woods for the model.

Adding some finishing touches to the stage model.

Securing the supporting columns to the base.

After endless days with limited amount of sleep, finally we proudly present our completed product: The Morwenna!

Group 10 with our completed stage! 


No comments:

Post a Comment